Moderators: Dennis Todaro
Go
New
Find
Notify
Tools
Reply
  
-star Rating Rate It!  Login/Join 
<Curious>
Posted
Hi all! Can anyone tell me what Fresenius Mfg. recomendations are on how often EST's should be performed on the K's?
 
Reply With QuoteEdit or Delete MessageReport This Post
<Tech Mgr.>
Posted
In the pm manual, under section 2.2, #8 - "Perform the electrial safety checks required by local codes, facility procedure and the Joint Commission on Accreditation of Healthcare Organizations."
 
Reply With QuoteEdit or Delete MessageReport This Post
<ElectroTester>
Posted
I always try to do them with each PM. Most want it done every 6 months, so if you do it every quarter, if you miss one, you will still be in compiance. it doesn't take that long to do so I have always just done it that way. Also, if you replace any elotonic parts i.e. boards, valves, sensors, you are to check it.
 
Reply With QuoteEdit or Delete MessageReport This Post
 Previous Topic | Next Topic powered by eve community  
 


Copyright RenalWEB 2008